Published August 30, 2018 | Version v1

Testing system for OBDT production

Authors/Creators

Contributors

Supervisor:

Description

The Muon Drift Tube(MDT) will be continuously used for the High Luminosity LHC, the high luminosity data taking period with the upgraded LHC. Although the MDT will be continuously used, the electronics of the MDT will be upgraded during the shutdown, due to the increase of the data rate and radiation. The board on the detector used as a TDC(Time-to-digital converter) to get the time information of the MDT will be exchanged to OBDT(On-Board electronics for DT boards) for the Phase-2. About 1000 OBDT's will be made for the MDT in the CMS. However, the OBDT's must be tested to qualify the production of the OBDT. To make the board test efficient, a firmware will be prepared. During the Summer Student Program for 10 weeks, my task was to make the firmware for testing the input of the OBDT.

Files

cern-summer-student_ver2.pdf

Files (5.1 MB)

Name Size Download all
md5:419b9979423976c2f4d1c847f63ed117
5.1 MB Preview Download

Additional details

Identifiers

CDS Report Number
CERN-STUDENTS-Note-2018-086

CERN

Linked records