Published September 13, 2019 | Version v1

Implementation of a new Triton control system for ROC

Authors/Creators

Contributors

Description

The ROC experiment at the COLLAPS beamline in the ISOLDE facility utilized a the Triton control system in an earlier setup. As it is planned to use this setup again, the control system is required again. As Triton has not been used in the meantime, the installation has not been maintained. This resulted in multiple problems that make it nearly impossible to use without prior experience with the Triton control system. To avoid the problem in the future, an installation routine based on files that are available at CERN and a new control interface have been created in this work.

Other

Abbreviations: Triton: TRIga pyThon cONtrol system

Files

Report_Daniel_Kabuss_2019.pdf

Files (173.8 kB)

Name Size Download all
md5:e6f9e71e4e0eb0a2a06661fe2ada7d77
173.8 kB Preview Download

Additional details

Identifiers

CDS Report Number
CERN-STUDENTS-Note-2019-196

CERN

Department
EP - Experimental Physics Department
Accelerator
CERN ISOLDE
Experiment
IS649
Facilities
ISOLDE

Linked records